All posts
DevOps

Zero-Downtime Deployments for Laravel

10 min read

A deploy should be a non-event. Users should never notice, and you should never hold your breath. Getting there is mostly about sequencing and atomicity.

Atomic Releases

The core idea is that a release either fully happens or does not happen at all. No half-updated file trees serving traffic.

Symlinked Releases

Deploy each release into a timestamped directory and flip a `current` symlink once it is fully built. Rollback becomes repointing the symlink at the previous release.

Warm the Caches

Before switching traffic, run `config:cache`, `route:cache`, `view:cache`, and `event:cache` on the new release so the first request is not the one that pays to compile everything.

Migrations Without Locks

Schema changes are where zero-downtime deploys usually break. The trick is to make every migration backward compatible.

Expand and Contract

Split risky changes into two deploys: first expand the schema so old and new code both work, then contract to remove the old shape after the new code is live. Never rename a column in a single deploy.

Restarting Workers Gracefully

Queue workers hold old code in memory. After a deploy, they must pick up the new release without dropping jobs.

Graceful Termination

Call `queue:restart` so workers finish their current job and exit cleanly, then let your process supervisor start fresh ones on the new release.

Closing Thoughts

Zero-downtime is not one feature; it is a set of habits: atomic release switches, backward-compatible migrations, and graceful worker restarts. Build them into the pipeline once and every deploy gets boring, which is exactly what you want.